? 穿越小说完本 ,盗墓笔记小说全集

亚洲 国产 图色色视频_黄色一级毛片免费的_精品亚洲欧美日韩在线_免费无码AV一级毛片_成人免费视频888在www电影_在线观看免费性爱视频_能看的一级黄色网站_日韩一区二区影院_成熟女人牲交片视频_亚洲 欧美 精品

新聞動(dòng)態(tài)
您的位置:首頁(yè) > 新聞動(dòng)態(tài) > 新聞動(dòng)態(tài)
  400-0602-365

Calibration operation method and precautions for distribution peristaltic pump

添加時(shí)間:2022-06-10 09:36:30   瀏覽次數(shù):312  

When the distributed peristaltic pump is used for timing and quantitative feeding, relative constant flow feeding and precise titration of liquid medicine, the flow calibration should be carried out first. If the flow still has deviation after one calibration, or the flow has deviation after the calibration has been put into use for a period of time, the same method can be used to calibrate again, so as to improve the measurement accuracy.

Flow calibration operation method:

(1) Enter the "flow correction" page and confirm that the pipeline has been fully filled (there is no air in the pipe). If it has not been fully filled, please start the peristaltic pump to perform filling. (in the flow correction mode, it will stop automatically after running for a period of time after starting) (2) prepare a container, clear the weight of the container on the electronic scale, place the container at the outlet of the pump pipe, press the start / stop key to start the peristaltic pump, and measure the amount of materials pumped (the unit can be ml, G, kg, etc.) after the peristaltic pump stops automatically. It is better to measure several times with the same method and take the average value of several times.

(3) Press the ENT key, cooperate with the up and down keys, and input the value measured in the previous step as the calibration value. For example, if the value measured in the previous step is 84.0g, set the "calibration value" to "84.00"; Then press ESC to exit the flow correction page.

(4) After calibration, if the flow or speed is reset, and the new value changes more than the original value, it shall be recalibrated.

Precautions for calibration operation:

(1) The rotating speed at calibration time is generally not less than 20rpm.

(2) After replacing the new pump pipe, run it at full speed for several minutes before calibration, and the effect is better.

(3) It is better to calibrate when the liquid level of raw material barrel is in the middle position (half barrel).

The distributive peristaltic pump plays the role of other pumps in the fields of high clean material transportation, precise flow control, precise dosing and micro filling. Correct use and reasonable maintenance are the necessary conditions to give full play to the superior performance of peristaltic pump.

1、 At the initial stage of using the peristaltic pump, pay attention to the service life of the pump pipe and make records. After use, try to replace the pump pipe before it reaches the expected service life.

II. In case of pipe breakage and leakage, the pump head shall be cleaned in time to prevent corrosive materials and easily solidified materials from damaging the roller parts of the pump head.

3、 Frequently check the operation flexibility of the roller, and timely repair the roller if it is found to be inflexible.

4、 The power supply must have a reliable grounding wire, which is the most important safety rule.

5、 Cut off the power supply when replacing the pump pipe and cleaning the machine body.

6、 Do not use a dripping cloth to wipe the signal terminals on the operation panel and the back of the chassis.

躬逢時(shí)代發(fā)展的盛世,慧宇人勇敢的迎接機(jī)遇與挑戰(zhàn)

從事精密流體傳輸與處理設(shè)備研發(fā)、生產(chǎn)和銷售,專注于創(chuàng)造高品質(zhì)、高性能、高使用價(jià)值的產(chǎn)品

如果您正在尋找相關(guān)產(chǎn)品或有其他任何問(wèn)題,可隨時(shí)撥打我公司銷售熱線,或點(diǎn)擊右方按鈕在線咨詢報(bào)價(jià)!
全國(guó)統(tǒng)─銷售熱線:400-0602-365
更多聯(lián)系方式
Copyright ? 慧宇偉業(yè)(北京)流體設(shè)備有限公司 All Rights Reserved  網(wǎng)站制作三金科技  備案號(hào):京ICP備17025788號(hào)-1